Training / AVCleared Installation Specialist / Lesson 7 of 7
Closeout and handover
As-builts, photos, firestop, punch list, cleanup and training.
About 10 minutes
Document what's really there
- Mark up as-built drawings with every field change: moved devices, different cable routes, added equipment.
- Photograph above-ceiling and in-wall work before it's closed up.
- Update the IP schedule and the cable schedule.
Restore the building
Every penetration through a fire-rated assembly gets a listed firestop system that matches the wall and penetration type. Patch, paint or replace what you disturbed, and return ceiling tiles.
Punch list
Walk the job with the client or their representative, list everything still open, fix it, and get their sign-off that it's done.
Clean up
Remove packaging and leftover material as the contract says. Leave rooms cleaner than you found them.
Train and hand over
Once the system is fully tested, train the people who'll use it, and hand over the documentation, warranty information and credentials (securely). The handover is the client's last impression of your work; make it a good one.