Skip to content

Reading a federal solicitation without missing what matters

Where to look first in an RFP or RFQ, how sections L and M drive your proposal, how to build a compliance matrix, and the bid/no-bid questions to answer before you spend a week writing.

Published November 9, 2026. 2 minute read.

A federal solicitation can run hundreds of pages. You don't need to read it front to back before deciding whether to bid; you need to read the right parts first.

Read these first (30 minutes)

  1. The cover page (SF 1449, SF 33 or SF 18). Due date and time with time zone, where to submit, the NAICS code, the set-aside, and the contracting officer.
  2. The set-aside and NAICS code. If it's set aside for a program you're not in, you can only join as a subcontractor. If it's a small-business set-aside, check that you're small under that code: see size standards.
  3. The statement of work or performance work statement. What they actually want installed or serviced, where, and when.
  4. Evaluation criteria (Section M in a UCF solicitation, or the "basis for award" paragraph). Lowest price technically acceptable (LPTA) and best value tradeoff call for very different proposals.
  5. Instructions (Section L, or "instructions to offerors"). Page limits, volumes, fonts, file formats, what goes where.

Amendments and Q&A

Agencies change solicitations through amendments, and you usually have to acknowledge every amendment in your proposal. Check SAM.gov for amendments until the due date. The question-and-answer period often has a deadline well before proposals are due; send questions early, and read every answer, because the answers bind all offerors.

Build a compliance matrix

List every "shall", "must" and instruction from sections L, M and the statement of work in a table, with where your proposal answers it and who owns it. Evaluators score against these lists; a missing item can make an otherwise strong proposal unacceptable. Your compliance matrix is also the outline for your proposal.

Watch for these in AV work

  • Equipment specified by brand name or "brand name or equal". If it's brand name only, check you can buy it at a competitive price.
  • Buy American and Trade Agreements clauses. Where the equipment is made matters.
  • Section 889 telecom and video surveillance rules. See Section 889.
  • Site access. Badging, escorts, clearances and working hours on a base or in a courthouse change your labor price.
  • Davis-Bacon or Service Contract Act wage determinations. Construction and service work has minimum wages and fringe you must price in.
  • Warranty, training and as-built documentation requirements.

Bid or no bid

Before you write, answer honestly:

  • Have we done this kind of work, at this size, recently? Do we have references the agency will believe?
  • Do we qualify for the set-aside, or do we have a teaming partner who does?
  • Do we know who the incumbent is and why the agency might change?
  • Can we meet the schedule and the limitations on subcontracting?
  • Is there enough time to do it well?

Two or three "no" answers usually mean pass and put the effort into the next one.

Sources